While working for a previous employer, Jon Altschuld was part of the design team for permanent flood recovery/repair projects along Fish Creek upstream of Estes Lake. These projects involved infrastructure (Fish Creek Road and adjacent bridges) repairs, trail repairs, and restoration of a healthy creek corridor for stretches of Fish Creek that were heavily affected by the flood. In addition to being part of the design team, Jon also flew sections of the projects and captured photos, videos, and 3D data.

Fish Creek Flood Recovery

Location: Estes Park, CO

Client: Town of Estes Park, Larimer County

Status: Constructed

Timeframe: 2015-2017

More
Fish Creek post-construction
Fish Creek post-construction
Fish Creek post-construction
Small drop structure and pool
Fish passage baffle retrofit
Aesthetic gabions on rebuilt wall
Fish Creek post-construction